SBA-Certified WOSB & EDWOSBNYS Licensed PE15+ years experience

Menu

HomeCapabilitiesService AreasAboutBlogFAQContact

Services

All servicesStructural Condition AssessmentsFoundation & Retaining Wall EvaluationsDrainage & Stormwater Management DesignSWPPP ServicesQA/QC ServicesConstructability ReviewsTechnical ReportsConstruction Support
Request a proposal Call (347) 647-0669
Design for water & permits

SWPPP Services

A SWPPP that just checks a box tends to fall apart on site. We write plans that match how the project will actually be built and inspected.

SEDIMENT-LADEN RUNOFFWOOD STAKEGEOTEXTILE FABRICTOE BURIEDIN TRENCHTRAPPEDSEDIMENTFILTERED FLOWSILT FENCE DETAIL (ESC)
C-501 · Erosion & sediment controlHIE · Not for construction
You receive
SWPPP with erosion and sediment control plans
Timeline
Before permit filing, supported through construction
Typical clients
Developers, general contractors, municipalities

When to call us

  • Your project disturbs enough ground to need construction stormwater coverage
  • You need a SWPPP to file a Notice of Intent (NOI)
  • Site conditions changed and the SWPPP needs an amendment
  • An inspection flagged erosion or sediment control problems

What's included

  • SWPPP preparation for SPDES permit coverage (NOI)
  • Erosion and sediment control plans and details
  • Construction-phase inspection support
  • SWPPP amendments as site conditions change
  • Coordination with contractors on practical installation
  • Documentation to support agency inspections

Scoped to your project. We scope against your actual site before quoting, and we'll tell you early if another discipline should go first, such as a geotechnical report before final structural design.

How the work runs

  1. Site and permit review

    We confirm which permits apply and what the plan must cover.

  2. Plan preparation

    SWPPP narrative plus erosion and sediment control plans and details.

  3. Filing support

    Help assembling the Notice of Intent and supporting documents.

  4. Construction support

    Amendments and inspection support as the site changes.

Common questions

Under New York State's construction stormwater permit, generally when a project disturbs one acre or more, with lower thresholds in some watersheds. New York City also has its own stormwater permit rules. We'll confirm which apply to your site.

Often. When the layout, phasing, or controls change, the SWPPP should be amended to match. We keep it current so it reflects what's actually on site.

Ready to scope SWPPP Services for your project?

Tell us what you're working on. You'll hear back within one business day from the engineer who'd do the work.